Name: SASHIMI LOGICS 2015-07-20 3:10
http://resources.sei.cmu.edu/asset_files/TechnicalReport/2000_005_001_13751.pdf
Have you take personal responsibility for your code today?
Have you filed out a sheet detailing what you planned to do today, how much of that you did, and why?
Did you producea PROBE estimate of your project today?
Do your Seeples methods have an average of 12.6583 lines of code in them today?
Did you remove defects before they existed today?
In the PSP, these methods are: following a defined process, planning the work, gathering data, and using these data to analyze and improve the processHave you take personal responsibility for your code today?
The right way is always the fastest and cheapest way to do a job.Have you filed out a sheet detailing what you planned to do today, how much of that you did, and why?
the accuracy of the estimate and plan is heavily influenced by how much the engineers know about the work to be doneDid you producea PROBE estimate of your project today?
use the time recording log to measure the time spent in each process phaseDo your Seeples methods have an average of 12.6583 lines of code in them today?
The added code is that code written for a new program or added to an existing base programDid you remove defects before they existed today?
This page intentionally left blank.